Brief Description

PARCO is a fully integrated energy company dealing in Oil Refining, Storage and distribution via pipeline systems and is considered to be the leading player in the industry. It is one of the largest companies of the Pakistani corporate sector with an asset base approaching US$ 1 billion as a joint venture between the Governments of Pakistan and Abu Dhabi

mod final

Design, engineering, supply, installation & commissioning of PLC/HMI system at TS & PS sites
Panel Manufacturing for TS & PS sites
Integrated FAT (for complete solution offered)
RTU configuration, assembly, testing and supply of RTU panels
Installation of complete hardware
Commission of all BV and CP sites along with assistance at MCC & AMCC

  • Avanceon provided the complete solution developed from scratch using state of the art technologies in the pipeline systems including the following:
  • 5000 I/O point system
  • Serck Control SCX SCADA software at MCC & AMCC
  • Pipeline Management Package
  • Allen Bradley PLC’s and ifix HMI at Terminal and Pumping Sites
  • CMI SCADA Pack RTU at BV & CP sites
Project Scope
mod final

Design, engineering, supply, installation & commissioning of PLC/HMI system at TS & PS sites
Panel Manufacturing for TS & PS sites
Integrated FAT (for complete solution offered)
RTU configuration, assembly, testing and supply of RTU panels
Installation of complete hardware
Commission of all BV and CP sites along with assistance at MCC & AMCC

Solution
  • Avanceon provided the complete solution developed from scratch using state of the art technologies in the pipeline systems including the following:
  • 5000 I/O point system
  • Serck Control SCX SCADA software at MCC & AMCC
  • Pipeline Management Package
  • Allen Bradley PLC’s and ifix HMI at Terminal and Pumping Sites
  • CMI SCADA Pack RTU at BV & CP sites

Clients' Review

“It is notable that in addition to the nine pumping and terminal stations a total of 128 RTUs for block valves, cathodic protection and microwave were installed and commissioned across 1400 KM long pipeline starting from Kemari to Mahmoodkot and all the way to Machhike. We have pleasure in acknowledging the fact that this very significant task, implemented across long distances of often inhospitable and dangerous terrain, was met by your team while maintaining a high standard of quality and professionalism.”